Case Studies

Direct Packaging
(Solutions)

How Solutions achieved £618K+ in lifetime savings with a 80kWp solar installation.

Scroll

Case Studies

Exceptional Results

This commercial solar installation delivers outstanding financial and
environmental returns.

£

1,072,780

Lifetime Bill Savings

£

59,000

+

Annual Savings

43.22

%

Internal Return Rate (IRR)

2.4

yrs

Payback Period

645

Solar Panels Installed

290.25

kWP

System Capacity
£

618,000

+
Lifetime Bill Savings
£

340,000

+
Lifetime Profit

24.42

%
Internal Return Rate (IRR)

5.1

yrs
Payback Period

200

Solar Panels Installed

80

kWp
System Capacity
All figures are estimated and subject to site conditions and energy usage patterns.
Client Objective

Why Renewable Energy?

Understanding the business drivers behind the decision to invest in solar

Reducing operational energy costs for packaging facility

Achieving sustainability targets for the business

Long-term protection against rising energy prices

Enhancing environmental credentials for customers

The Challenge

Overcoming Obstacles

Every project presents unique constraints. Here’s what we navigated to deliver success.
Industrial Roof Structure

Ensuring structural integrity for panel installation on industrial building

Operational Hours

Aligning installation with facility operating schedule

Self-Consumption Optimisation

Maximising on-site energy usage during production hours

S-TEC Solution

Our Approach

A tailored solution designed to maximise returns while meeting all technical and commercial requirements.

Panel Selection
200 high-efficiency solar panels configured for optimal roof coverage
System Design
80kWp system designed to match facility's energy consumption profile
Monitoring System
Real-time energy monitoring for performance tracking and optimisation
Financial Model
Capital purchase delivering 24.42% IRR with 5.1-year payback
Delivery & Installation

From Concept to Completion

Our streamlined approach delivers exceptional results with minimal disruption.
01

Initial Consultation

Comprehensive site survey and energy consumption analysis for optimal system sizing.
02

Design & Planning

Custom 80kWp system design with 200 panels, tailored to the facility's roof layout.
03

Installation

Professional installation with minimal disruption to packaging operations.
04

Handover

System commissioning, grid connection, and full training on monitoring platform.
Environmental Impact

Powering a Sustainable Future

Beyond financial returns, this installation makes a significant environmental
difference.

All figures are indicative and subject to site conditions and energy usage patterns. Environmental calculations are
based on standard conversion factors.

Is This Relevant?

This Project May Be
Relevant If...

  • Industrial facilities with daytime energy demand

  • Packaging and manufacturing businesses

  • Companies seeking mid-range solar installations (50-100kWp)

  • Businesses in Essex and surrounding areas

  • Organisations looking for 5-year payback on solar investment

Sound like your situation? Let’s explore how we can help.

Ready to Transform Your
Energy Future?

Join industry leaders like Waymade PLC in making the switch to
sustainable energy. Discover how much your business could save.

Scroll to Top